A 107-meter-long wind turbine blade has arrived in the U.K. for testing. In an announcement Thursday, the Offshore Renewable Energy (ORE) Catapult said the blade would be tested at facilities in Blyth, Northumberland.
The blade, from LM Wind Power, is designed to be used on GE Renewable Energy’s Haliade-X 12 MW turbine, which will have a capacity of 12 megawatts and a height of 260 meters once fully assembled.
Comments